-
Regal Road, Toronto
Structural Remodelling Project
This text will describe the scope of the project, the work it took and then results. One, two, three,
four, five, six, seven, eight, nine, ten,
eleven, twelve, thirteen, fourteen, fifteen, sixteen, seventeen, eighteen, nineteen, twenty, twenty-one,
twenty-two, twenty-three, twenty-four, twenty-five, twenty-six, twenty-seven, twenty-eight, twenty-nine,
thirty, thirty-one, thirty-two, thirty-three, thirty-four, thirty-five, thirty-six, thirty-seven,
thirty-eight, thirty-nine, forty, forty-one, forty-two, forty-three, forty-four, forty-five, forty-six,
forty-seven, forty-eight, forty-nine, fifty.
2016 CIBC Regal Road Commercial
День открытых дверей на Регал Роуд: One, two, three, four, five, six, seven, eight, nine, ten, eleven, twelve, thirteen, fourteen, fifteen, sixteen, seventeen, eighteen, nineteen, twenty, twenty-one, twenty-two, twenty-three, twenty-four, twenty-five, twenty-six, twenty-seven, twenty-eight, twenty-nine, thirty, thirty-one, thirty-two, thirty-three.
(Click on preferred source to open the video)
One, two, three, four, five, six, seven, eight, nine, ten, eleven, twelve, thirteen, fourteen, fifteen, sixteen, seventeen, eighteen, nineteen, twenty, twenty-one, twenty-two, twenty-three, twenty-four, twenty-five, twenty-six, twenty-seven, twenty-eight, twenty-nine, thirty, thirty-one, thirty-two, thirty-three, thirty-four, thirty-five, thirty-six, thirty-seven, thirty-eight, thirty-nine, forty, forty-one, forty-two, forty-three, forty-four, forty-five, forty-six, forty-seven, forty-eight, forty-nine, fifty.
Упоминание в прессе
A brief local tabloid write-up
this is a footer that should be aligned right -
Greensides Ave, Toronto
this is a footer that should be aligned right
One-liner description goes here.
A high-density urban infill development project involving:
- single-to-semi conversion (more specifically, a Twin-Home Reconstruction) with Fire-Rated Party Wall Integration and Façade Retention with symetrical alterations
- Adaptive Re-engineering (Surgical Structural Replacement, performed a load-path transfer, replacing the structural skeleton while using the three remaining walls as a non-structural "template" or envelope)
- Double Vertical (up and down) & Horizontal Expansion
A two-story, single lot reconstruction project which involved property severance, structure underpinning, complete inside demolition including structural elements, (piece-by-piece demolition and rebuilding so no wall supports were required) removal of roof and attic, demolition of rear wall foundation, facade alterations to create symmetrical windows and entrances, third floor and rear three-story addition construction. Everything other than the three walls was new, and even one of those was altered (side walls had no windows). Слушание и положительное решение
Горкомиссии по Землепользованию:
ВЛАДЕЛЕЦ: John McCrap-pants Sr. Статья о строительном проекте в газете
The Globe and Mail от 14 февраля 2019 года:
-
Next, something about something, which is probably very important for reasons. But, for now, it ain't nothing but a something.
this is a footer that should be aligned right